A C. Fly original design, completed in 2013. Designed for the DOTD, this landing barge operates in the lower algiers region. Everything design related C. Fly took care of which includes drawing submittals, engineering calculations, and stability analysis.

Leave a Reply

Your email address will not be published. Required fields are marked *