Currently under construction, the Brandon Bordelon is the third vessel of the stingray series. It is due for delivery by the end of the year. C Fly was involved in the entire design process for this vessel, including drawing submittals, engineering calculations, and stability analysis.
- Designs
- Services
- META
- Contact